Direct Answer
For Jurong Island petrochemical sites we specify vinyl ester FRP grating on dock hose walkways, tank-farm operating platforms and pipe-rack stair access. The panels handle tropical heat, chloride-laden sea breeze and hydrocarbon splash, carry 12 kN/m2 at 900 mm, and clip down with SS316 fasteners so maintenance crews work without a hot-work permit on the quayside.
- Best for: Dock hose walkway, tank platform, pipe-rack stair
- Specify when: Vinyl ester resin, 38 mm molded, grit top
- Key spec: 38 mm vinyl ester, 19.5 kg/m2, 12 kN/m2 at 900 mm, SS316
A petrochemical terminal on Jurong Island had been replacing steel grating on three quayside routes every three years. Tropical heat, salt air and regular hose-down after product transfers all attacked the zinc coating from below. We supplied 38 mm molded vinyl ester panels with grit tops, cut to the existing support spacing and fixed with SS316 clips. Two and a half years on, none of the three areas has been blasted, recoated or re-clipped, and the quayside crew has stopped booking hot-work windows for grating repairs.
Site conditions and the three project cases
Why steel fails on a Jurong quayside
Painted steel grating on Jurong Island rarely lasts beyond three to five years. Tropical heat holds the deck above 40 C most of the day, which speeds coating embrittlement, while salt-laden sea breeze drives chloride into every clip hole. Hydrocarbon splash from hose transfers strips the zinc within months, and hose-down water sits on the top surface after every ship call. By year three the panels flex, the stringers pit and the terminal books another hot-work outage.
The heat, chloride and hydrocarbon splash combination is what kills steel on the quayside.Case 1: hose connection walkway on the dock
The hose connection walkway runs along the dock face where operators connect and disconnect 12-inch marine hoses twice per cargo transfer. Hydrocarbon spray and occasional product drips cover the deck, so painted steel rusts from the top down. We installed 38 mm molded vinyl ester panels with a grit top, spanning 900 mm between the existing dock brackets and clipped with SS316 fasteners. The open mesh lets drips fall into the drain below, and the grit stays non-slip even when the deck is wet from hose-down.
Hose-connection teams report less slipping during monsoon season than they had on the old steel.Case 2: operating platform on the tank farm
The tank-farm operating platform sits on top of four floating-roof tanks where operators walk to the gauge and sampling points. Steel here was blasted and recoated every three years, but the recoat required tank entry permits and took the units out of service. We supplied 38 mm molded vinyl ester panels with a concave surface, pre-cut around the gauge housing and the ladder landing. The panels weigh about a quarter of steel at equal stiffness, so the existing tank curb carried them without modification.
The last turnaround needed zero hot work on the grating, which let the tanks return to service three days early.Case 3: stair access up the pipe rack
The pipe-rack stair and landing carry maintenance crews up to the header manifolds that run across the terminal. Steel stringers and treads corroded at the welds in under four years, and welding repairs needed a gas-free certificate along the whole rack. We supplied 38 mm pultruded I-bar panels with a grit top for the landing, paired with pultruded stair treads and SS316 clips. The pultruded sections weigh 15 to 17 kg/m2 and clear the longer rack spans between columns.
Crews now walk the rack during running hours because they no longer wait for a hot-work permit.Product selection, maintenance and specifications
Product types and resin selection
Vinyl ester was the right resin here because the site sees hydrocarbon splash, chloride air and tropical heat rather than just outdoor UV. Isophthalic would have been cheaper but would not hold up to repeated product splash. For the longer pipe-rack spans we moved to 50 mm pultruded I-bar, which weighs 15 to 17 kg/m2 and clears wider gaps than molded. Surfaces follow duty: grit top for the hose walkway and stair treads, concave for the tank platform. Where fire load is a concern we can add flame retardant to reach ASTM E84 Class 1.
Every clip and bracket is SS316, never carbon steel, to keep fasteners from corroding under the panels.Maintenance and service life
Maintenance is limited to a monthly fresh-water hose-down after the monsoon peaks to wash salt off the grit, and an annual walk-around to check clip torque and the sealed cut edges. The factory seals every edge so chloride cannot wick into the glass fibers. We expect 20 plus years of service on the dock walkway and tank platform, and 15 to 20 years on the pipe-rack stairs, against three to five years for the painted steel it replaced. Spare panels are pre-cut to the same size, so a damaged section swaps in with hand tools during a planned ship gap.
No blasting, no recoating, no gas-free certificate is needed to keep the deck in service.How to start your project
To quote a Jurong terminal project we need three inputs. First, a sketch with support spacing, dock elevation and the width of the hose walkway. Second, the product list the deck will contact directly, including crude, refined product or chemical names and operating temperatures. Third, the loading case, whether operators with tools or hand-truck and forklift traffic. We come back with a load-table check against the m38 rating of 12 kN/m2 at 900 mm, a vinyl ester recommendation, and surface swatches for site testing. Our Nantong plant has exported to 45 plus countries for 20 plus years.
Send the product list and the support spacing first; the resin and thickness follow from those two.Standard specifications and delivery
Standard molded panels ship at 1220 by 3660 mm and we cut them to net size at the factory, so the on-site crew only does light fitting around hose reels and brackets. Thickness options cover 25, 30, 38, 50 and 65 mm, with the 65 mm panel at 38 kg/m2 for heavy zones. The minimum order is 10 m2, and lead time runs 12 to 36 working days depending on resin and thickness. Oversized panels, custom colours, new moulds and specialty resins are quoted with a separately confirmed schedule. Each shipment carries the ISO 9001 certificate numbered 01708Q11888R0S and the ASTM F3059 report numbered 211122012SHF-001, with SGS inspection on request.
Panels are bundled by dock berth and labeled by tank number so the installer can hoist them straight to the platform.Key takeaways
Three points sum up this Jurong terminal job. First, the painted-steel replacement cycle of three years is gone; the vinyl ester panels are now in year two and a half with zero recoating. Second, the 38 mm vinyl ester panels clear the 900 mm span at 12 kN/m2, which is the rating most hose walkways and tank platforms need. Third, SS316 clips and factory-sealed edges remove the two points that used to corrode first.
If you are rebuilding a quayside walkway or a pipe-rack stair, start with the product list and the support spacing, and the rest follows.For the technical background see
FRP grating for the Jurong Island petrochemical hub and
Non-sparking FRP grating for oil and gas pipe racks.
Which resin do you recommend for hydrocarbon splash on the dock?
Vinyl ester is the standard call here; isophthalic handles UV but not repeated product splash. We back it with the ASTM F3059 report numbered 211122012SHF-001.
Can panels be installed without a hot-work permit on the rack?
Yes. Panels clip on with SS316 fasteners and need no welding, so crews can lift and fix sections during running hours without a gas-free certificate.
What lead time applies to a vinyl ester dock order?
Standard vinyl ester panels ship in 12 to 36 working days depending on thickness, with a minimum order of 10 m2 and ISO 9001 certificate 01708Q11888R0S attached.
FRP Grating Technical Team