FRP Grating in a French Power Plant: Tower, Treatment and Gate

Project Case Studies
Direct Answer

French power stations sit in chlorinated cooling water, humid turbine rooms and intake bays where steel rusts in under six years. Isophthalic FRP grating takes the humidity and the chlorides without a paint cycle, without hot-work crews and without booking the annual outage for panel swaps.

  • Best for: Cooling tower walkways, water treatment platforms, intake gate channels
  • Specify when: Isophthalic polyester, 38 mm molded, concave surface, SS316 clips
  • Key spec: 38 mm isophthalic, 19.5 kg/m2, 900 mm span, ASTM F3059 report

A French thermal power station ran steel grating in three wet zones: the walkways around the cooling tower basin, the platform above the demineralized water treatment skid, and the grating over the intake gate channel. Steel held five to six years before chlorinated cooling water ate through the bar ends, and each swap was booked into the annual outage, pulling O&M off routine turbine work. We supplied isophthalic FRP grating on all three routes, and none now needs sandblasting, repainting or a hot-work permit during the planned shutdown.

Site conditions and the three project cases

Why steel fails in a power station wet zone

Power station wet zones combine continuous humidity, chlorinated cooling water, and the warm air rising from the turbine hall. Steel grating sweats overnight, the drain holes hold chloride residue, and the bar ends corrode first because water wicks between the bar and the frame. Galvanized steel loses zinc in four to six years; painted steel chips where boots and hoses drag. The intake bay adds splash from raw river water and mud, which abrades any coating. Steel panels in this service average a five-year replacement cycle, booked into the annual outage.

Case 1: cooling tower perimeter walkway

Around the cooling tower basin, operators walk the perimeter to check fill nozzles and bleed valves. We supplied 38 mm molded FRP grating in isophthalic polyester with concave surface, 900 mm support span, clipped to the existing concrete curb angles with SS316 clips. Concave sheds cooling water and condensate straight through the mesh, so boots never stand on a film. The isophthalic system is UV-stabilized for the outside run, and the panel weighs 19.5 kg per square meter, so two maintenance staff lift a section out to reach the valves below.

Case 2: demineralized water treatment platform

Above the reverse osmosis and mixed-bed skid, a small service platform carries instrument air lines and a walkway for resin change-out. We supplied 30 mm molded grating in isophthalic polyester with smooth surface, clipped to the skid frame. Smooth is the right choice here because demineralized water spills and resin dust wipe off without trapping grit. The platform is non-conductive, so electricians work around energized MCC cabinets without insulating mats, and the 30 mm depth keeps the structure light enough that the skid frame did not need strengthening.

Case 3: intake gate channel cover

Over the raw water intake channel, steel trench covers had become slippery in winter and heavy for one operator to lift. We supplied 38 mm molded grating as removable cover sections with SS316 lifting handles, each under 30 kg, seated in the existing steel frame. The covers let river debris and rain fall through while keeping boots and tools out of the channel. Because FRP does not rust at the frame contact, the edge no longer stains the concrete walkway below, which had to be power-washed every spring.

Product selection, maintenance and specifications

Product types and resin selection

Across the three zones the rule is straightforward. Outdoor cooling tower work takes UV-stabilized isophthalic polyester, 38 mm molded, concave surface. Indoor treatment skids take 30 mm smooth, where cleanliness matters more than slip. Intake covers take 38 mm molded with lifting handles. Vinyl ester is reserved for sites that dose chlorine gas or acid regeneration directly onto the grating, which is not the case here. All clips are SS316, and cut edges are sealed so chlorinated water cannot enter the fiberglass bundle.

Maintenance and service life

FRP grating in a power station needs no painting, but it does need the annual walkdown. Technicians rinse the cooling tower walkways with low-pressure water to remove silt and salt, check clip torque, and look for chipped edge seal on the intake covers. Expected life in cooling water service is 15 to 20 years, against five to six years for galvanized steel. Pre-cut replacement sections arrive flat-packed from Nantong, and a swap is a clip-out, clip-in job that fits inside the planned outage window with no hot work.

How to start your project

Send us three items: a sketch of the walkway or platform with support spans, the water chemistry and dosing (chlorine dose, pH, temperature), and the surface and load requirement. We check the span against the load table, confirm isophthalic versus vinyl ester against the dosing sheet, and send surface coupons so the station staff can compare concave against smooth under their boots. For French projects we pack the EN-facing documentation alongside ISO 9001 certificate 01708Q11888R0S.

Standard specifications and delivery

Molded panels ship at 1220 by 3660 mm, in 25, 30, 38, 38x40, 50 and 65 mm depths, mesh 38x38 or 50x50. Pultruded T and I profiles come in 25, 38, 50 and 76 mm depths for longer spans. MOQ is 10 m2 and lead time is 12 to 36 working days depending on resin. Oversized panels, custom colours, new moulds and specialty resins are quoted with a separately confirmed schedule. Each order ships with the ISO 9001 certificate, the ASTM F3059 report 211122012SHF-001, and SGS reports on request. Panels are banded into packs sized for the station gate and forklift.

Key takeaways

Three points close the case. First, cooling water and humidity kill steel in five to six years; isophthalic FRP is specified for 15 to 20 years in the same service. Second, indoor treatment platforms benefit from smooth surface and non-conductive material, not heavier steel. Third, 38 mm molded at 19.5 kg per square meter carries 12 kN per square meter at 900 mm span, which covers the cooling tower walkways and intake covers without a steel redesign.For the technical background see Non-conductive FRP for power stations and cooling towers and EN-standard FRP for French power and chemical works.
Which resin fits cooling tower chlorinated water?
Isophthalic polyester with UV stabilization is the standard choice. Vinyl ester is reserved where chlorine gas or acid regeneration lands directly on the grating, which is rare on a cooling tower perimeter.
Does 38 mm molded FRP carry a technician with a tool bag?
At 900 mm span the M38 panel carries 12 kN per square meter, which covers personnel walkways with tool bags. For cart or forklift loads we move to 65 mm molded at 38 kg per square meter.
Can replacement panels be fitted during the annual outage?
Yes. Pre-cut segments clip onto existing angles with SS316 clips, with no welding and no coating touch-up. A typical walkway swap fits inside the planned outage window.
ZEALL Engineer

FRP Grating Technical Team

FRP composite industry expert with 20+ years of experience in the design, engineering and manufacturing of FRP gratings for corrosion-resistant and heavy-duty applications. Published by NANTONG ZEALL NEW MATERIALS CO., LTD.

Published: 2026|Category: Project Case Studies|Author: FRP Grating Technical Team
Have Questions? Contact Us →
Previous Article
FRP Solar Rooftop Walkway Grating Guide
📞 Contact UsHomeProductsCatalogueApplicationsProjectsMarketsBlog🎬 VideosTools💰 CalculatorAbout

Project background

The case covers a French thermal power station where steel grating in three wet zones was being replaced on a five-to-six-year cycle. The three zones are the walkway around the cooling tower basin, the service platform above the reverse-osmosis and mixed-bed demineralized water skid, and the removable covers over the raw-water intake gate channel.

Power station wet zones combine continuous humidity, chlorinated cooling water and warm air rising from the turbine hall. Steel sweats overnight, drain holes hold chloride residue, and bar ends corrode first because water wicks between bar and frame. The intake bay adds splash from raw river water and mud, which abrades any coating. The operator asked for a non-painting alternative that could be swapped inside the annual planned outage without pulling O&M off routine turbine work.

Specifications and load ratings

The cooling tower perimeter walkway uses 38 mm moulded isophthalic panels with a concave surface, spanning 900 mm on the existing concrete curb angles. The demineralized water platform uses 30 mm moulded isophthalic panels with a smooth top, clipped to the skid frame. The intake gate channel uses 38 mm moulded removable cover sections with SS316 lifting handles, each kept under 30 kg and seated in the existing steel frame.

The 38 mm moulded panel weighs about 19.5 kg per square metre and is rated for 12 kN per square metre at 900 mm span, the personnel-with-tools load class most cooling tower walkways and intake covers require. Isophthalic polyester was selected with UV stabilization for the outside cooling-tower run; vinyl ester is reserved for sites that dose chlorine gas or acid regeneration directly onto the grating. Standard moulded panels ship at 1220 by 3660 mm in 25, 30, 38, 38x40, 50 and 65 mm depths; pultruded T and I profiles come in 25, 38, 50 and 76 mm depths for longer spans. Every clip is SS316 and every cut edge is sealed so chlorinated water cannot enter the fibreglass bundle.

Installation and field practice

Panels are cut to net size at the Nantong factory, with pre-cut openings around the fill nozzles, the bleed valves, the instrument air lines and the intake gate frame. On site the crew only does light fitting around the skid frame and the concrete curb. Each panel is fixed with SS316 clips at every support; the removable intake covers seat into the existing steel frame and lift out with SS316 handles.

Installation follows standard field practice: panels are banded into packs sized for the station gate and forklift, staged on the walkway, lifted by two fitters and clipped down. No sandblasting, no repainting and no hot-work permit is needed during the planned outage. Because FRP is non-conductive, electricians work around energised MCC cabinets on the demin platform without insulating mats. Spare sections are pre-cut to the same size and shipped flat-packed; a swap is a clip-out, clip-in job inside the outage window.

Delivery scope, acceptance and observed service

This page does not disclose the project area, piece count, operator name, contract value or completion year. The following is the delivery scope and the acceptance focus rather than a quantified outcome claim.

Delivery scope: 38 mm moulded isophthalic concave panels on the cooling tower perimeter walkway, 30 mm moulded isophthalic smooth panels on the demineralized water treatment platform, and 38 mm moulded removable intake gate covers with SS316 lifting handles, all with SS316 clips and factory-sealed edges. Technical targets met: concave face sheds cooling water and condensate straight through the mesh; smooth demin face wipes clean without trapping grit; non-conductive material removes the need for insulating mats around MCC cabinets; removable covers let operators lift the channel without strain. Acceptance focus at handover was clip torque on every support, sealed cut edges, surface finish per zone, and lift weight of the removable covers. Expected life in cooling water service is 15 to 20 years, against five to six years for galvanized steel.

Common failure modes in this industry and how to prevent them

1. Insufficient electrical clearance between energised equipment and conductive walkway creates tracking and flashover risk.

A 10-30 kV arc flash can burn through the panel and injure operators. Surface tracking can also run along the bar for metres.

Maintain minimum 200 mm clearance at 10 kV, 300 mm at 20 kV between grating and live parts. Use non-conductive GRP with Barcol ≥40. Add a 50 mm insulating barrier where clearance cannot be met.

2. Ground potential rise during a fault creates step and touch voltage across the walkway surface.

A 500 V step potential can be fatal in 0.5 s. Operators working on energised platforms are exposed during earth faults.

Bond every panel to the site earthing grid with SS316 jumpers. Test step/touch voltage with a stake method. Specify anti-static additives where earth rise exceeds safe limits.

3. UV and thermal cycling (40°C day / -10°C night) embrittle outdoor GRP over 8-10 years.

Surface crazing lets water in, and thermal expansion delaminates the bar from the bearing bar.

Specify isophthalic resin with UV stabiliser for outdoor use. Inspect annually for crazing. Replace panels where crazing exceeds 20% of the surface area.

4. Cooling-tower splash and humidity keep panels wet; biofilm grows on the underside and accelerates gel-coat wear.

Wet GRP loses friction, and biofilm holds acid-laden condensate against the bar, accelerating hydrolysis.

Use vinyl ester or phenolic resin in cooling-tower zones. Schedule high-pressure washing at 6-month intervals. Ensure drainage slope ≥2% so water does not pond on the bars.

Failure mode Trigger condition Prevention parameters
Tracking / flashover Walkway near live 10-20 kV equipment 200-300 mm clearance; Barcol ≥40; 50 mm barrier
Step/touch voltage Earth fault, GPR on platform SS316 earthing jumpers; stake test; anti-static
UV / thermal embrittlement Outdoor deck, -10 to +40°C cycling Isophthalic + UV stabiliser; annual inspection; replace >20% crazing
Wet / biofilm wear Cooling tower splash, humidity Vinyl ester/phenolic; 6-month wash; ≥2% slope

Related products and project references

The cooling tower and intake routes draw on the moulded isophthalic product family for cooling-water and chloride service; the indoor demin platform uses the lighter 30 mm smooth range where cleanliness matters more than slip. SS316 clips, isophthalic edge-sealing resin and FRP handrail systems are the standard hardware across the routes. For a new French power-station enquiry the technical team asks first for walkway and platform sketches with support spans, the water chemistry and dosing (chlorine dose, pH, temperature), and the surface and load requirement; minimum order is 10 square metres and lead time runs 12 to 36 working days depending on resin.

Document Preview

Preview mode · For full document, click Download

Download Document

Thank you for your interest. Please fill in your email and company name. Our technical and sales team will contact you within 30 minutes (during working hours) to provide support!

📧 Your information will be sent to sales@gratingfrp.com. We respect your privacy and will never share your data.

Thank You!

Your request has been received successfully.

Our technical and sales team will contact you within 30 minutes (during working hours) to provide the document and professional support!

If you need urgent assistance, please email: sales@gratingfrp.com